Effective date: 10 JUL 2025|Publication date: 15 MAY 2025

AIRAC AIP SUP 07/2025

ESTABLISHMENT OF NEW TWY N1 AT DOHA INTERNATIONAL AIRPORT (OTBD)

1 INTRODUCTION

1.1 Establishment of TWY N1 at Doha International Airport for operational use.

2 TAXIWAY DESCRIPTION

2.1Designation:N1
2.2Width:30M
2.3Strength & Surface:
2.3.1TWY N1 between edge of TWY Z and 106m from RWY 15-33 CL, Concrete, PCR 880/R/A/X/T.
2.3.2TWY N1 between 106m from RWY 15-33 CL and Edge of RWY 15-33, Asphalt, PCR 1280/F/B/W/T.
2.4TWY Center line lights:Provided
2.5TWY Edge lights:Provided
2.6Stop bar lights:Provided
2.7RWY Guard lights:Provided
2.8TWY CL marking:Provided
2.9TWY Edge line marking:Provided
2.10RWY Holding position marking:Provided
2.11Declared Distance for TWY N1 intersection:
2.11.1RWY 33:TORA 3034mTODA 3217mASDA 3034mLDA Not applicable
2.11.2RWY 15:TORA 1566mTODA 1840mASDA 1566mLDA Not applicable

3 ATTACHMENT

3.1 A graphical representation of the taxiway is attached to this supplement.
New TWY N1
PDF

4 VALIDITY

4.1 Valid UFN.
-END-